Energy freight is a project, even when it looks like a container

A pump in a 20-foot box is ocean freight. A transformer, a blade, a skid that exceeds the envelope, or a string of equipment that has to arrive in installation order is project cargo. We quote the first as a container and the second as a plan: dimensions, lifting points, permits and the port that can actually receive it.

Houston is often the right ocean gateway for Gulf and Middle East energy lanes; Newark and Savannah cover Atlantic work. We arrange the ocean or air leg, the heavy-haul road moves, and the export filing. We do not run the mine, the pad or the wind farm — site handling belongs to your contractor, and we coordinate up to the agreed handover.

This page is for you if…

  • Equipment is oversized, overweight or has to travel as breakbulk
  • The shipment is a set of pieces that must arrive in a sequence
  • Oilfield chemicals, batteries or other DG travel with the equipment
  • The destination is a job site, not a warehouse with a dock

This is not the page for…

  • Owning the heavy-lift crane or the installation crew at destination
  • Bulk commodity trading (crude, grain, ore) as a cargo owner
  • A pallet of spares with no project constraint — that is ordinary air or LCL

What we move for energy

Oil and gas equipment

Drilling, production and refining gear — skids, pipe, valves, pumps — including pieces that travel with a hazardous class and need IMO documentation.

  • FCL for what fits; breakbulk or flat-rack for what does not
  • SDS and class checked before the booking is offered to a carrier
  • Houston and East Coast gateways chosen by origin, not habit

Renewable energy components

Wind, solar and storage equipment. Blades, towers and transformers are planned as out-of-gauge; panels and inverters usually as FCL.

  • Piece-level dimensions before we name a vessel
  • Port and inland route checked for length and weight limits
  • Staged arrivals when the site cannot take the full set at once

Mining and minerals equipment

Machines and parts destined for remote sites. The hard part is usually the last inland leg, not the ocean crossing.

  • Origin yard to port heavy-haul arranged with the right trailer
  • Destination inland scoped with the local agent before we book
  • No assumption that a site has a crane until you say it does

Power generation and grid gear

Transformers, generators, switchgear and plant equipment that are heavy, expensive and intolerant of a dropped booking.

  • Lifting plan and lashing spec as part of the file
  • Insurance on declared value, quoted in writing
  • Delivery window aligned with the outage or commissioning date

Moving energy equipment this quarter?

Request a quote

Services this cargo usually uses

Most energy files are ocean plus a heavy road leg. Air is for the critical spare, not the transformer.

How a project-energy shipment is booked

  1. Measure before promising a mode

    Length, width, height, weight, lifting points and whether it is DG. A photo of the nameplate is useful; a guess at “about a container” is not.

  2. Port, vessel and inland path

    We pick a gateway the piece can enter and leave, then a sailing or charter that accepts it. The inland route is checked for permits before the ocean is confirmed.

  3. Pack, lash, file

    Crating or seafastening to the method the carrier approved. Export declaration filed in-house. No cargo is delivered to a terminal on a verbal “it should fit”.

  4. Handover at the site, not at a mystery depot

    Destination agent, trucker and site contact named on the file. If the site is not ready, we say so early rather than accruing demurrage in silence.

Papers this cargo usually needs

Packing list with piece dimensions
Each oversize or heavy piece listed separately. “1 lot machinery” is not enough to book a flat-rack.
Dangerous goods documents
SDS and the class/UN number for anything that travels as DG — oilfield chemicals, lithium batteries, pressurised units.
Export filing
AES/EEI filed in-house. Licensed energy equipment is flagged before the booking, not at the terminal.
Survey and lashing records
Where the carrier or underwriter requires a load survey, it is part of the file, not an afterthought after damage.

Energy freight questions

What energy cargo do you handle?

Oil and gas equipment, renewable components, mining machines, transformers, generators and the spares that keep a site running. Bulk commodities as a cargo owner are not our product.

Can you move oversized or heavy pieces?

Yes, once we have dimensions, weight and lifting points. We book flat-rack, open-top, breakbulk or charter — we do not force an oversize piece into a dry van and hope.

Do you go to remote job sites?

We arrange the inland leg with a local agent and a trucker who can actually reach the site. We need the site constraints (crane, hours, road limits) before we confirm delivery, not after the vessel has sailed.

How do you handle hazardous energy cargo?

Classified, packed and offered only to carriers that accept that UN number. If the SDS is missing, there is no booking. That is slower than a verbal “it is fine” and is why the cargo is allowed to load.

Get a price for energy cargo

Piece list with dimensions and weight, origin, destination and the date the site can receive it. Oversized photos help more than adjectives.